Phase 2

When the terminal is finished all European flights will be located to this terminal and the overall design will be focused on the demand of EU pax

Phase must be finished in the year 2021 and will be able to handle 41 million pax annual. The second phase of the terminal will be located on the second half of terminal 3. This part will be an international area with only international flights. The international area will be completely separate from the LCC area and will be connected with an APM to terminal 1. In the center of terminal 3 an open area will be created with retail that is relevant for transferring pax. Beneath this area a APM station will be located to connect this area with the main terminal T1.